久久免费精品一区二区-久久免费精品视频-久久免费精品国产72精品剧情-久久免费精彩视频-有码 亚洲 制服 国产 在线-友田真希息与子中文字幕

行業資訊

DHK型快速環鏈電動葫蘆,使用規則

DHK型快速環鏈電動葫蘆 ,使用規則。適用場所設備制造、生產加工、倉儲物流、船塢碼頭等。

快速環鏈電動葫蘆

1、使用前必須對吊鉤、鏈條、吊銷等部件進行檢查,確認機件完好無損后,方可使用。

2、使用時,必須確認被提升物不得超過產品額定起重量,也不能用兩臺產品同時提升一件物品。

3、提升重物前,起重鏈條應自然垂直懸掛,不得斜吊,雙行起重鏈條產品,下吊鉤嚴禁在兩行鏈中翻轉,重物提升高度不得超過額定起重高度。

4、提升重物時,嚴禁工作人員在重物下面做任何工作或行走。

5、電源電壓,頻率必須符合銘牌上面的規定,在額定功率下,電壓不得低于額定值的90%。

6、產品應避免雨淋,也不適合于提升有毒、有腐蝕、高溫高壓、易燃易爆的物品,工作環境應符合:溫度-25℃+40℃,濕度<90°。

7、產品當用于腳手架整體提升時,應有專人安裝、操作,懸掛結束后,應由空載試運行,檢查各連接件、起重鏈、吊鉤等有無異常,確認完好后在使用。掛架前應調整起重鏈條的長度,使掛架后每臺電動葫蘆的起重鏈條的張緊度一致,提升時,應有專人觀察每臺產品,查看腳手架是否與墻體相碰。提升機是否有異常聲音或卡鏈,發現異常應立即停機檢查,排除故障后,方可使用。

DHK type fast chain electric hoist, rules of use

1. Before use, check the hook, chain, revocation and other parts, and confirm that the parts are intact before use.

2. When using, it must be confirmed that the lifting object shall not exceed the rated lifting weight of the product, and it is not allowed to lift one object with two products at the same time.

3. Before lifting heavy objects, the lifting chain shall be naturally suspended vertically without inclined lifting. Double row lifting chain products are prohibited.

4. When lifting heavy objects, it is strictly prohibited for staff to do any work or walk under the heavy objects.

5. The power supply voltage and frequency must meet the requirements specified on the nameplate, and the voltage shall not be lower than 90% of the rated value at the rated power.

6, the product should avoid the rain, also not suitable for ascension toxic, corrosion, high temperature and high pressure, inflammable and explosive items, work environment should meet: temperature 25 ℃ + 40 ℃, humidity < 90 °.

7. When the product is used for the overall hoisting of the scaffold, it shall be installed and operated by a special person. After the suspension, it shall be carried out no-load test run to check whether there is any abnormality in the connecting parts, lifting chain and lifting hook, etc., and it shall be put into use after being confirmed intact. The length of lifting chain shall be adjusted before the hanger to make the tension of lifting chain of each electric hoist behind the hanger consistent. When lifting, special personnel shall observe each product to check whether the scaffold touches the wall. If there is any abnormal sound or card chain in the elevator, stop the machine to check if there is any abnormal sound or card chain.




主站蜘蛛池模板: 小s现场抛胸挤奶 | 噜噜噜狠狠夜夜躁精品 | 免费观看桶机十分钟 | 99久久亚洲精品影院 | 欧美日韩中文字幕综合图区 | 艳妇臀荡乳欲伦岳TXT下载 | 秋葵app秋葵官网18在线观看 | YELLOW免费观看完整视频 | 亚洲AV日韩AV欧美在线观看网 | 国产成人精品视频免费大全 | 亚洲精品www久久久久久久软件 | 亚洲精品久久久午夜福利电影网 | 欧美日韩视频高清一区 | 欧美日韩视频高清一区 | 国产AV在线传媒麻豆 | 69精品人人人人 | 欧美牲交视频免费观看K8经典 | 国产在线精品视频二区 | 99视频这里只有精品 | 免费三级播放器 | 97精品国产亚洲AV高清 | 久久久久99精品成人片三人毛片 | 超碰97人人做人人爱亚洲尤物 | 国产精品99久久免费黑人人妻 | 99久久国产综合精品网成人影院 | 日本无修肉动漫在线观看 | 亚洲 小说 欧美 激情 另类 | 99re8热视频这在线视频 | 囯产免费久久久久久国产免费 | s8sp视频高清在线播放 | 北条麻妃快播 | 午夜精品久久久久久99热蜜桃 | 翘臀少妇被扒开屁股日出水爆乳 | 久久亚洲这里只有精品18 | 国产精品久久久精品a级小说 | 色戒在线完整观看在线播放版 | 国产日韩欧美高清免费视频 | 亚洲VA欧美VA天堂V国产综合 | 欧美18videosex初次| 午夜福利自怕 | 在线视频 国产精品 中文字幕 |